Planning to visit the 140th Canton Fair in Guangzhou to source steel or other products from China?
A successful trade fair visit starts before you arrive.
This buyer checklist covers what international buyers should prepare before the Canton Fair, what information to collect from suppliers, what questions to ask during meetings, and what to check before requesting a quotation or placing an order.
What Should Buyers Prepare for Canton Fair 2026?
Before visiting the Canton Fair, buyers should prepare five things:
For steel buyers, it is particularly important to prepare information such as steel grade, standard, thickness, width, coating, quantity, packaging requirements, destination port, and required certificates.
Contents
- Product Requirements
- Prepare Your RFQ Before the Fair
- Research Suppliers Before the Canton Fair
- Verify the Supplier
- Questions to Ask Steel Suppliers
- Compare Suppliers on More Than Price
- Check the Steel Specification Carefully
- Confirm MOQ and Lead Time
- Bring These Documents to the Canton Fair
- Take Notes During Every Meeting
- Steel Buyer Quick Checklist
- Canton Fair 2026: Steel Buyer FAQ
Canton Fair 2026 Buyer Checklist
Use the following checklist before your trip.
Product Requirements
Before contacting suppliers, make sure you know what you need.
Example
Instead of asking:
"I need galvanized steel."
Prepare a specification such as:
Galvanized steel coil, DX51D+Z, 0.50 × 1250 mm, Z120, regular spangle, ASTM/EN equivalent, 100 MT.
The more specific your RFQ is, the easier it is for suppliers to provide comparable quotations.
Prepare Your RFQ Before the Fair
A well-prepared RFQ can save considerable time during supplier meetings.
Your RFQ should include:
| Information | Example |
|---|---|
| Product | PPGI Coil |
| Grade | DX51D+Z |
| Thickness | 0.50 mm |
| Width | 1250 mm |
| Coating | Z120 |
| Color | RAL 9002 |
| Quantity | 100 MT |
| Destination | Jebel Ali, UAE |
| Incoterm | CIF |
| Packaging | Export seaworthy packaging |
| Documents | MTC, COO |
| Inspection | Third-party inspection |
If you already have an Excel purchase list or technical specification, bring it with you or upload it when contacting suppliers.
Research Suppliers Before the Canton Fair
Do not wait until you arrive in Guangzhou to start looking for suppliers.
Create a shortlist before the exhibition.
For each supplier, record:
A shortlist of 5–10 relevant suppliers can be more useful than collecting hundreds of business cards.
Verify the Supplier
A supplier's booth, website, or catalog does not tell you everything you need to know.
During your meeting, ask questions that help you evaluate whether the supplier can actually handle your requirements.
Supplier Verification Checklist
For large or recurring orders, buyers may also consider conducting additional supplier verification and factory audits before placing an order.
Questions to Ask Steel Suppliers
Do not only ask:
"What's your price?"
A better supplier meeting should cover product, quality, production, logistics, and commercial terms.
Product
- What steel grades do you supply?
- Which standards can you produce to?
- What thickness and width ranges are available?
- Can you provide customized specifications?
- Do you supply coils, sheets, or both?
Quality
- What quality documents are provided?
- Can you provide an MTC for each shipment?
- Can we arrange third-party inspection?
- How do you control coating thickness?
- How do you control dimensional tolerances?
- What happens if the delivered product does not meet specifications?
Production
- Is the product manufactured in your own facility?
- What is the normal production lead time?
- What is your monthly production capacity?
- Can you support repeat orders?
Export
- Which countries do you regularly export to?
- Which ports do you normally use?
- Can you quote FOB and CIF?
- Can you arrange export documentation?
Compare Suppliers on More Than Price
The lowest quotation is not necessarily the lowest total purchasing cost.
When comparing suppliers, record the following information:
| Item | Supplier A | Supplier B | Supplier C |
|---|---|---|---|
| Product | |||
| Grade | |||
| Standard | |||
| Thickness | |||
| Coating | |||
| Quantity | |||
| FOB Price | |||
| CIF Price | |||
| Lead Time | |||
| MTC | |||
| Inspection | |||
| Payment Terms | |||
| Packaging | |||
| Warranty / Claims |
This makes it easier to compare quotations on an equivalent basis.
Check the Steel Specification Carefully
When comparing quotations, make sure suppliers are quoting the same specification.
For example, a PPGI quotation should not be compared only by price per ton.
Check:
- Steel grade
- Standard
- Thickness
- Width
- Zinc coating
- Paint system
- Top coating thickness
- Back coating
- Paint brand
- RAL color
- Surface finish
- Coil weight
- Inner diameter
- Packaging
A lower price may reflect a different specification.
Ask About MTC and Quality Documents
For steel procurement, documentation is an important part of supplier evaluation.
Ask suppliers whether they can provide:
If your project requires a specific standard such as ASTM, EN, JIS, or GB, confirm the applicable standard before requesting a final quotation.
Confirm MOQ and Lead Time
Before leaving the meeting, ask:
What is your MOQ for this specification?
What is the production lead time for this quantity?
What is the lead time for repeat orders?
Can you supply a trial order?
Can you reserve production capacity for regular orders?
This is particularly important when your initial order is small, but your long-term purchasing volume may be larger.
Confirm Shipping Information
International buyers should provide their destination port whenever possible.
For example:
CIF Jebel Ali Port
or
CIF Dubai
Ask the supplier for:
Comparing FOB and CIF quotations can help you understand the actual landed purchasing cost.
Bring These Documents to the Canton Fair
For professional sourcing meetings, prepare a digital or printed procurement package.
Recommended Buyer Documents
If confidentiality is important, avoid sharing sensitive commercial information until the supplier relationship has been properly established.
Plan Your Supplier Meetings
Don't rely entirely on walking around the exhibition hall.
Prepare a meeting schedule.
Example
09:30 – Supplier APPGI / PPGL
100 MT trial orderCIF Dubai10:30 – Supplier BGalvanized steel coil
ASTM specification200 MT14:00 – Supplier CCold rolled steel
Automotive applicationLeave enough time between meetings so you can visit additional suppliers and compare products.
Take Notes During Every Meeting
Do not rely on business cards alone.
For every supplier, record:
Also take photos of product samples, catalogs, technical documents, and booth information where appropriate.
After the Canton Fair
Your supplier evaluation should continue after the exhibition.
Within a few days after the fair:
The goal of the Canton Fair is not simply to collect business cards.
The goal is to identify suppliers that can move from conversation → quotation → sample → trial order → repeat order.
Steel Buyer Quick Checklist
If you are short on time, use this simplified checklist.
Before the Fair
- ☐ Define products
- ☐ Prepare specifications
- ☐ Estimate quantity
- ☐ Prepare RFQ
- ☐ Research suppliers
- ☐ Create supplier shortlist
- ☐ Arrange meetings
During the Fair
- ☐ Verify product capability
- ☐ Ask about standards
- ☐ Check quality documentation
- ☐ Discuss MOQ
- ☐ Discuss lead time
- ☐ Request quotation
- ☐ Confirm shipping options
- ☐ Record supplier information
After the Fair
- ☐ Compare quotations
- ☐ Verify suppliers
- ☐ Request samples
- ☐ Arrange inspection/audit
- ☐ Confirm commercial terms
- ☐ Place trial order
Canton Fair 2026: Steel Buyer FAQ
When is the 140th Canton Fair?
The 140th Canton Fair will be held in three phases in Guangzhou in October and early November 2026.
Buyers should check the official Canton Fair schedule and exhibition category before planning their visit.
What should I bring to a steel supplier meeting?
Bring your product specifications, estimated quantity, destination port, required standards, quality requirements, and any existing purchase list or drawings.
What information should I include in a steel RFQ?
At minimum, provide product type, grade, standard, dimensions, quantity, destination, and preferred Incoterm.
For coated steel, also specify coating weight, paint system, color, surface finish, and other relevant requirements.
How do I compare Chinese steel suppliers?
Compare suppliers using the same product specification and consider price, quality requirements, documentation, production capability, lead time, inspection options, and export experience.
Should I request a sample before placing an order?
For new suppliers or technically sensitive products, buyers may consider requesting samples or placing a trial order before committing to larger recurring volumes.
Download the Steel Buyer Checklist
Planning to visit the Canton Fair?
Use our Steel Buyer Checklist to prepare your supplier meetings and RFQs.
Looking for a Steel Supplier in China?
Promisteel will attend the 140th Canton Fair in Guangzhou, Oct 2026.
If you are sourcing steel from China, Promisteel can discuss your requirements before or during the Canton Fair.
You can send us your product specifications, quantity, and destination port to request a quotation.
Request a QuoteBook a Meeting at Canton FairExplore Steel ProductsDownload the Canton Fair buyer checklist




